search

hb563 Preventative Maintenance Checklist

Job #

Customer

Model #

Engineer

Serial #

Date

Check that the customer does not have any problems or questions concerning the UPS.

Surrounding Environment

Bypass

OK

Needs Attention

Not Applicable

Switch Fitted?

Condition

Operation

Terminal Tightness

     

Check auto bypass operation (if fitted)

     

UPS

OK

Needs Attention

Not Applicable

Clean Fans and Ventilation Slots

Check Fan Operation

Internal Condition

Clean Boards

Check Wiring and PCBs for signs of heat damage and wear

Check that all connections are tight

Check that all earth points are tight

Check that any oil filled capacitors are not leaking

Check for old blue type capacitors change as necessary and remove thermal fuses

Check I/O voltage and battery voltage for calibration

Check that any internal/external chargers are functioning correctly

Batteries (Internal and External)

OK

Needs Attention

Not Applicable

Check battery terminals for corrosion and tightness

Before load testing check battery float voltage

Load test UPS 100% and check battery

During battery discharge check dc current calibration

Check battery charge current

Logs

OK

Needs Attention

Not Applicable

Check inverter logs for errors

Check alarm logs for errors

Clear alarm and inverter logs

Front Panel

OK

Needs Attention

Not Applicable

Check the set-up of the UPS

Set the time and date

Run battery and inverter test from front panel

Check the front panel operation

Perform full operational test and download system memory

Notes

Customer Name

Customer Sign

Position

Comments

Engineer Sign

Date

part of the AEL technical handbook return to hb000 Handbook Index


Valid HTML 4.01 Transitional Valid CSS! Level A conformance icon, W3C-WAI Web Content Accessibility Guidelines 1.0