| Job # |
Customer |
||
|
Model # |
Engineer |
||
|
Serial # |
Date |
||
Check that the customer does not have any problems or questions concerning the UPS. |
|||
Surrounding Environment |
|||
Bypass |
OK |
Needs Attention |
Not Applicable |
|
Switch Fitted? |
|||
|
Condition |
|||
|
Operation |
|||
|
Terminal Tightness |
|||
|
Check auto bypass operation (if fitted) |
|||
UPS |
OK |
Needs Attention |
Not Applicable |
Clean Fans and Ventilation Slots |
|||
Check Fan Operation |
|||
Internal Condition |
|||
Clean Boards |
|||
Check Wiring and PCBs for signs of heat damage and wear |
|||
Check that all connections are tight |
|||
Check that all earth points are tight |
|||
Check that any oil filled capacitors are not leaking |
|||
Check for old blue type capacitors change as necessary and remove thermal fuses |
|||
Check I/O voltage and battery voltage for calibration |
|||
Check that any internal/external chargers are functioning correctly |
|||
Batteries (Internal and External) |
OK |
Needs Attention |
Not Applicable |
Check battery terminals for corrosion and tightness |
|||
Before load testing check battery float voltage |
|||
Load test UPS 100% and check battery |
|||
During battery discharge check dc current calibration |
|||
Check battery charge current |
|||
Logs |
OK |
Needs Attention |
Not Applicable |
Check inverter logs for errors |
|||
Check alarm logs for errors |
|||
Clear alarm and inverter logs |
|||
Front Panel |
OK |
Needs Attention |
Not Applicable |
Check the set-up of the UPS |
|||
Set the time and date |
|||
Run battery and inverter test from front panel |
|||
Check the front panel operation |
|||
Perform full operational test and download system memory |
|||
Notes |
|||
Customer Name |
|||
Customer Sign |
|||
Position |
|||
Comments |
|||
Engineer Sign |
|||
Date |
|||
| |